Perhaps the most relevant statistics data that we could gather is presented here:
Data type/Website parameter | Status or value | Our findings |
---|---|---|
Site title (meta) | Transition to College Mathematics and Statistics | Sticking to between 50-60 characters for meta title length is a good idea. The length of this website's meta title is 48. |
Website load speed | Approximately 0.6579 seconds | Website load speed is on a good level, great! But if an improvement can be made, it's always for the better. |
Homepage links | Approximately 6 | Such an amount of links on a homepage might raise a question or two. |
Size of page HTML | 11.2KB | This is a very good result, as search engines prioritize websites that are quick to load. |
Server data | Server seems to be online. IP adress for this domain is 50.62.160.57. | Due to lack of data, we can't provide a meaningful insight. |
The basic overview not enough? Let's dive deeper.
What is a server? It's basically a physical storage device (one that, sometimes, makes up several virtual servers for the cheaper shared hosting) that holds all the files and databases associated with a specific website or websites. Obviously, it's a touch more complicated than that (servers also have processors), but the essence is quite simple - your browser contacts the server, which then sends all the neccessary information and files to your computer. Each physical server has a unique IP address assigned to it, too, for easy recognition.
If you need more raw data, here's what we managed to gather:
Header information |
---|
HTTP/1.1 200 OK Content-Type: text/html Last-Modified: Mon, 11 Sep 2017 02:48:17 GMT Accept-Ranges: bytes ETag: "1ddda36ba82ad31:0" Server: Microsoft-IIS/8.0 X-Powered-By: ASP.NET X-Powered-By-Plesk: PleskWin Date: Sun, 12 Nov 2017 01:23:37 GMT Content-Length: 11300 |
Typos are not uncommon, not even with website addresses. More than that, the more popular the website, the more typos there tend to happen. We have gathered and generated the following list of most frequently encountered mistypes for tcmsproject.org:
Here is a list of some more reports for you to check. If you found this one on tcmsproject.org useful, the following list will be of interest to you, too:
This list contains 370 top level domain variantions for tcmsproject.org domain name: