Perhaps the most relevant statistics data that we could gather is presented here:
Data type/Website parameter | Status or value | Our findings |
---|---|---|
Site title (meta) | Paul Revere Williams Project | Sticking to between 50-60 characters for meta title length is a good idea. The length of this website's meta title is 28. |
Website meta description | A description has not been provided for this site. | The length of the meta description is 50 characters. Google recommends up to around 280-320 characters at the most. |
Website load speed | Approximately 0.95 seconds | Website load speed is on a good level, great! But if an improvement can be made, it's always for the better. |
Rank by Alexa | 994,637 | We are not fans of the Alexa rank, but if we base our assumptions on it, the website is not that popular. |
Global rank by Quantcast | 976,492, after last update | Based on the gathered data, Quantcast does not consider this website to be popular. Take it for what it's worth. |
Homepage links | Approximately 21 | A good amount of links and nothing to worry about. |
Pages linking back | We counted 113 | Such a low amount of backlinks is insufficient and either shows the website is of low quality, or does not reach a wide audience. |
Size of page HTML | 14.4KB | This is a very good result, as search engines prioritize websites that are quick to load. |
Server data | Server seems to be online. IP adress for this domain is 74.205.120.254. | Due to lack of data, we can't provide a meaningful insight. |
The basic overview not enough? Let's dive deeper.
A website is not just Quantcast ranks and meta information. There is a whole lot more to it. Let's give it a proper look now, shall we?
Data type/Website parameter | Status or value | Our findings |
---|---|---|
Similar websites | thenativelatourist.com founderslosangeles.org laconservancy.org neonmuseum.org lainsidertours.com |
While we can't speak with a hundred percent certainty, these website seem to fall into the same category as paulrwilliamsproject.org. Thus, they probably target the same audience and, likely, keywords. |
The following statistics are provided only as an approximation. We can't guarantee the numbers are absolutely correct, but we do believe they are very much within the ballpark and, as such, can give a pretty good idea about the popularity of this website.
Let's start with some telling numbers and then break it all down.
Data type/Website parameter | Status or value | Our findings |
---|---|---|
Average visit time | 0:31 | To keep visitors around for longer one needs to provide regular, captivating content. This result is a good indication that such content may be missing. |
Alexa, perhaps the oldest ranking system of its sort, bases it's website rating on approximated number of visitors of a specific page. In other words, the more visitors, the higher the global and local ranks. As of recently, Alexa has well over four million websites ranked. Having said all that, Alexa rank should be taken with a grain of salt. Or a massive bucketload. In other words, we think it to be greatly overrated, as it never takes into account how popular a website is within its niche.
QUANTCAST is very similar to Alexa, though perhaps enjoys an overall better user opinion even if, by comparison, the data processing company's rank index is smaller. The main interest of QUANTCAST is real-time audience analysis, so again the rank is based on traffic. QUANTCAST gathers this data mainly for advertising purposes of other companies. We know that, so far, QUANTCAST has ranked 162,659,459 websites, give or take a few. With all of this said, Quantcast rank is not really any more useful than that of Alexa and most similar ranking systems. Few of them, if any, take context into account and rate websites purely on traffic numbers (guesstimated, in so many cases). It's by far not the most accurate representation of a website's worth.
What is a server? It's basically a physical storage device (one that, sometimes, makes up several virtual servers for the cheaper shared hosting) that holds all the files and databases associated with a specific website or websites. Obviously, it's a touch more complicated than that (servers also have processors), but the essence is quite simple - your browser contacts the server, which then sends all the neccessary information and files to your computer. Each physical server has a unique IP address assigned to it, too, for easy recognition.
If you need more raw data, here's what we managed to gather:
Header information |
---|
HTTP/1.1 200 OK Date: Fri, 28 Apr 2017 19:12:43 GMT Server: Apache/2.2.3 (Red Hat) X-Powered-By: PHP/5.2.17 Set-Cookie: PHPSESSID=gqis6jfudtvk07mrqhoknv5q15; path=/ Expires: Thu, 19 Nov 1981 08:52:00 GMT Cache-Control: no-store, no-cache, must-revalidate, post-check=0, pre-check=0 Pragma: no-cache Vary: Accept-Encoding Connection: close Transfer-Encoding: chunked Content-Type: text/html; charset=UTF-8 |
WHOIS entry |
---|
Domain Name: PAULRWILLIAMSPROJECT.ORG Registry Domain ID: D154924196-LROR Registrar WHOIS Server: Registrar URL: http://www.godaddy.com Updated Date: 2016-12-18T14:37:33Z Creation Date: 2008-12-17T20:22:02Z Registry Expiry Date: 2018-12-17T20:22:02Z Registrar Registration Expiration Date: Registrar: GoDaddy.com, LLC Registrar IANA ID: 146 Registrar Abuse Contact Email: Registrar Abuse Contact Phone: Reseller: Domain Status: clientDeleteProhibited https://icann.org/epp#clientDeleteProhibited Domain Status: clientRenewProhibited https://icann.org/epp#clientRenewProhibited Domain Status: clientTransferProhibited https://icann.org/epp#clientTransferProhibited Domain Status: clientUpdateProhibited https://icann.org/epp#clientUpdateProhibited Registry Registrant ID: C80374413-LROR Registrant Name: Reuben Brunson Registrant Organization: RocketFuel Registrant Street: 80 Monroe Ave Registrant Street: Ste 610 Registrant City: Memphis Registrant State/Province: Tennessee Registrant Postal Code: 38103 Registrant Country: US Registrant Phone: +1.9015220205 Registrant Phone Ext: Registrant Fax: Registrant Fax Ext: Registrant Email: Registry Admin ID: C80374415-LROR Admin Name: Reuben Brunson Admin Organization: RocketFuel Admin Street: 80 Monroe Ave Admin Street: Ste 610 Admin City: Memphis Admin State/Province: Tennessee Admin Postal Code: 38103 Admin Country: US Admin Phone: +1.9015220205 Admin Phone Ext: Admin Fax: Admin Fax Ext: Admin Email: Registry Tech ID: C80374414-LROR Tech Name: Reuben Brunson Tech Organization: RocketFuel Tech Street: 80 Monroe Ave Tech Street: Ste 610 Tech City: Memphis Tech State/Province: Tennessee Tech Postal Code: 38103 Tech Country: US Tech Phone: +1.9015220205 Tech Phone Ext: Tech Fax: Tech Fax Ext: Tech Email: Name Server: NS61.DOMAINCONTROL.COM Name Server: NS62.DOMAINCONTROL.COM DNSSEC: unsigned URL of the ICANN Whois Inaccuracy Complaint Form: https://www.icann.org/wicf/ >>> Last update of WHOIS database: 2017-08-04T04:51:02Z <<< For more information on Whois status codes, please visit https://icann.org/epp Access to Public Interest Registry WHOIS information is provided to assist persons in determining the contents of a domain name registration record in the Public Interest Registry registry database. The data in this record is provided by Public Interest Registry for informational purposes only, and Public Interest Registry does not guarantee its accuracy. This service is intended only for query-based access. You agree that you will use this data only for lawful purposes and that, under no circumstances will you use this data to: (a) allow, enable, or otherwise support the transmission by e-mail, telephone, or facsimile of mass unsolicited, commercial advertising or solicitations to entities other than the data recipient's own existing customers; or (b) enable high volume, automated, electronic processes that send queries or data to the systems of Registry Operator, a Registrar, or Afilias except as reasonably necessary to register domain names or modify existing registrations. All rights reserved. Public Interest Registry reserves the right to modify these terms at any time. By submitting this query, you agree to abide by this policy. |
Typos are not uncommon, not even with website addresses. More than that, the more popular the website, the more typos there tend to happen. We have gathered and generated the following list of most frequently encountered mistypes for paulrwilliamsproject.org:
Here is a list of some more reports for you to check. If you found this one on paulrwilliamsproject.org useful, the following list will be of interest to you, too:
This list contains 370 top level domain variantions for paulrwilliamsproject.org domain name: