Perhaps the most relevant statistics data that we could gather is presented here:
Data type/Website parameter | Status or value | Our findings |
---|---|---|
Site title (meta) | Microsoft Project MVP (Oleksiy Prosnitskyy's blog) | Sticking to between 50-60 characters for meta title length is a good idea. The length of this website's meta title is 50. |
Website meta description | A description has not been provided for this site. | The length of the meta description is 50 characters. Google recommends up to around 280-320 characters at the most. |
Website load speed | Approximately 0.2932 seconds | Website load speed is on a good level, great! But if an improvement can be made, it's always for the better. |
Pages linking back | We counted 9 | Such a low amount of backlinks is insufficient and either shows the website is of low quality, or does not reach a wide audience. |
Size of page HTML | 20.7KB | This is a very good result, as search engines prioritize websites that are quick to load. |
Server data | Server seems to be online. IP adress for this domain is 172.217.22.97. | Due to lack of data, we can't provide a meaningful insight. |
The basic overview not enough? Let's dive deeper.
A website is not just Quantcast ranks and meta information. There is a whole lot more to it. Let's give it a proper look now, shall we?
Data type/Website parameter | Status or value | Our findings |
---|---|---|
Similar websites | constructionleadingedge.com projectserver2013blog.com christineflora.com projecttraining.com microsoftepmsolution.blogspot.com |
While we can't speak with a hundred percent certainty, these website seem to fall into the same category as msprojectmvp.blogspot.com. Thus, they probably target the same audience and, likely, keywords. |
What is a server? It's basically a physical storage device (one that, sometimes, makes up several virtual servers for the cheaper shared hosting) that holds all the files and databases associated with a specific website or websites. Obviously, it's a touch more complicated than that (servers also have processors), but the essence is quite simple - your browser contacts the server, which then sends all the neccessary information and files to your computer. Each physical server has a unique IP address assigned to it, too, for easy recognition.
If you need more raw data, here's what we managed to gather:
Header information |
---|
HTTP/1.1 200 OK Content-Type: text/html; charset=UTF-8 Expires: Mon, 16 Oct 2017 09:32:20 GMT Date: Mon, 16 Oct 2017 09:32:20 GMT Cache-Control: private, max-age=0 Last-Modified: Tue, 03 Oct 2017 06:59:10 GMT X-Content-Type-Options: nosniff X-XSS-Protection: 1; mode=block Server: GSE Accept-Ranges: none Vary: Accept-Encoding Transfer-Encoding: chunked |
Typos are not uncommon, not even with website addresses. More than that, the more popular the website, the more typos there tend to happen. We have gathered and generated the following list of most frequently encountered mistypes for msprojectmvp.blogspot.com:
Here is a list of some more reports for you to check. If you found this one on msprojectmvp.blogspot.com useful, the following list will be of interest to you, too:
This list contains 370 top level domain variantions for msprojectmvp.blogspot.com domain name: